الوصف الوظيفي
Monitors and reviews all aspects of PCD functions on projects to ensure that the quality of the cost engineering is in accordance with the established company procedures and expectations.
Ensures that the cost control processes are consistently applied across the project.
Supervises and assists the PCM and assigned team in preparing and presenting costs and any other special project performance/status reviews as required.
Presents draft proposal budgets for cost proposal reviews and refines budget templates and narratives as necessary.
Works with assigned business line management to address any problems or concerns related to the project and/or PCD staff functions.
Works with Operations and Tendering in preparing Preliminary Project Execution Plan (PPEP) during the proposal phase and with the Project team in preparing the final PEP immediately after a project is awarded.
Sets up cost reports in a standardized format as defined by the project’s requirements, develops, implements and maintains planned versus actual tracking sheets for various line items within project budgets.
Analyzes costs and reports on anomalies, fluctuations, unusual occurrences or other spending concerns that could impact the project’s final cost forecast and expected completion date.
Provides technical guidance in Cost Management and Control Change Management Forecasting.
Provides technical guidance, training and staffing support in cost engineering projects within a specified country area.
Provides comments and recommendations for cost engineering requirements for staffing and project control. Prepares detailed staffing plans for cost engineering activities.
Maintains safety standards and complies with Company’s Health, Safety and Environment Management System requirements.
Takes reasonable care of your own health and safety and that of others in the workplace.
Follows and maintains Company Quality standards in accordance with Company Quality System requirements.
Informs themselves of the relevant Quality, Environmental, Safety and Occupational Health Policies, Manuals and Procedures within Hill International and ensures continued compliance with these requirements while employed by Hill.
Perform other duties as assigned by the line manager/supervisor.
المهارات
Bachelor’s degree in Business Administration, Quantity Surveying, Law and Engineering, Construction Management, or equivalent degrees from an accredited university in KSA.
At least 10+ years of experience in cost control, including holding the position of cost manager in mega projects.
Experience in performing, controlling and reviewing costs for engineering disciplines, financial reporting systems and on-site cost analysis.
Statistical know-how in the fields of sampling distribution, probability, hypothesis testing, knowledge, supervision, personnel management, and training of technical and non-technical work staff.
The ability to plan, organize, perform, review, and present the outputs of cost engineering, cost estimation, and measurements, including the outputs of planning and scheduling independently, with minimal supervision and judgment in general, from the perspective of knowledge related to the technical skills of planning, scheduling, engineering design, and construction practice.
Verbal and written communication skills.
Advanced knowledge of engineering, procurement, contracts, construction and start-up processes.
Knowledge of engineering and construction management written over time through specialized education or practical experience.
This position reports to Cost Control Manager
تفاصيل الوظيفة
منطقة الوظيفة الرياض, المملكة العربية السعودية
قطاع الشركة البناء والتشييد
طبيعة عمل الشركة صاحب عمل (القطاع الخاص)
الدور الوظيفي التمويل والإستثمار
نوع التوظيف دوام كامل
الراتب الشهري غير محدد
عدد الوظائف الشاغرة 1
https://www.bayt.com/ar/saudi-arabia/jobs/cost-consultant-saudi-national-4693427/