|
||||||||||||||||||
GENERAL REQUIREMENT: All Engineers shall have an respective Engineering Degree with a minimum of 7 years Engineering Design experience from Conceptual Front End Engineering Design to Detailed Engineering related to Oil & Gas, Refineries & Petrochemical Industries and shall be conversant with the application and verification of relevant International Codes and Standards and capable of working on all project activities found in such Industries. They shall also provide Procurement & Construction Management support. All Engineers should have Engineering Design Consultancy Experience. Preference will be given to Candidates with Saudi Aramco experience. They should be able to work in a project task force environment with Client Representatives. Shall have very good inter-personal and effective communication skills and guide / train junior engineers. 1) SENIOR CIVIL DESIGN ENGINEERS (code:10) 2) SENIOR STRUCTURAL DESIGN ENGINEERS (code:11) 3) SENIOR DESIGN ENGINEERS - PROCESS (code:12) Shall have exposure to all process engineering activities and work processes found in this sector, including the preparation of; • Technical specifications and project instructions Preference will be given to candidates with Saudi Aramco experience. 4) MECHANICAL – PIPING ENGINEER (code: 13) Shall have exposure to Process in plant piping engineering activities and work processes found in this sector and will be responsible for the following : Proposal Stage: Evaluate incoming RFQ’s for Piping scope of work and quantify manhour requirements and any special technical requirements to complete the job FEED/ Project Proposal Articulate overall Project Piping requirements as defined by Process Engineering through PFD’s, P&ID;’s and Basis of Design Documents Search for and retrieve existing relevant client drawings Develop Piping portion of the Project drawing control Revise existing Plot Plans to incorporate Piping installation or coordinate with Facilities Planner to develop “Grassroots” Layout Receive from Process Engineering, process generated Piping requirements such as Line Designation Table, Piping MAOP, Design Pressure & Temperature, Complete Bulk MTO’s – Piping Support Procurement Effort for DCPR’s and material sourcing Articulate overall Project Piping requirements as defined by Project Proposal/FEED drawings and documents through PFD’s, P&ID;’s and Piping Plot plans Search for and retrieve existing relevant client drawings and process revision numbers or apply for new drawing numbers. Finalize Plot Plans Receive from Process Engineering, final process generated Piping requirements such as final PFD’s, P&ID;’s, Line Designation Table, Piping MAOP’s, Design Pressure & Temperature, Special Pipe Material considerations, Pipe sizing, Pipe Slope requirements, process related special installation requirements, etc Complete Piping Isometric Drawings Complete Hydrostatic Drawings Preference will be given to candidates with Saudi Aramco experience |
||||||||||||||||||