الوصف الوظيفي
Scaffold Supervisor provides technical direction and leadership to Scaffold Crew.
Supervise and/or direct work, manage daily schedule, and visit job sites to oversee work
activities. Ensure that Scaffolding Procedures are established and followed, and that
safe work standards are understood and practiced.
A certified scaffolding supervisor, who is familiar with scaffolding standards for the type
of scaffolds being erected, will be assigned for the fulfillment of the contract related job
requirements. He will closely monitor the scaffolding erection to ensure that the erection
is done accordance with the approved Scaffold design and specifications. He will
coordinate and follow the Site In charge/ Superintendent and End User (client)
instructions and directions.
المهارات
1) Ensures that all scaffolding required in the live operating plant is installed safely in
accordance with the industrial standards and as per the approved PTW procedure.
2) Supervisors are responsible and accountable for ensuring that all work activities in
their area are conducted in a safe manner.
3) Coordinates with project in-charge to ensure availability of scaffolds at locations
where work is being planned to start to avoid any hold of work due to nonavailability of scaffolds.
4) Responsible for the support of company EHS and Quality policies and programs.
5) Select and identify suitable type of scaffolding for the safe execution of works in a
live operating plant.
6) Supervisor able to understand scaffold Drawing (Plan/Sections).
7) Ability to understand and follow work schedule/plan and meet End User
Company’s deadline.
8) Prepare Method of statement and help safety officer in preparing Risk assessment.
9) Daily deliver Toolbox safety talk relevant to task performed.
10) Provide 24 hours, 7 days a week “on call” provides scaffolding support in the event
of Plant Emergencies.
11) To lead a team of scaffold crew and maintain harmonious working relationships.
12) Overall coordination & responsible for erection and dismantle of scaffolding.
13) Co-ordinate with client representative internal departments to ensure scaffolding
work as per priorities & avoid rework/ replication of scaffolding.
14) Supervisor able to propose and implement corrective actions for any nonconformity.
15) Provide regular and timely feedback regarding performance.
16) Regularly communicate expectations to crew with respect to safety, work
execution, procedures, efficiency and encourage open communication from team
members.
17) Use and maintain the proper safety equipment and PPE at all the times in
accordance with the safety training, manufactures instructions and company
policy.
18) Comply with safety rules and regulations.
19) Be aware of the implications of legislation or other good industry practices, relating
to the task at which they are based.
20) Initiating and completing all applicable section of the permit to work to ensure it is
conducted in the most efficient manner.
21) Notifying the issuer of work progress and completion, and ensuring that the site is
returned to a safe and operational state.
22) Taking adequate care to preserve the permit in good condition.
23) Providing and arranging all necessary resources related with performing the work.
24) Show a personal example of good safety practice. Ensure that scaffolder’s are
properly instructed in precautions to be taken, before they allowed to the start work.
25) Conduct daily work site inspection to identify and correct any existing unsafe
conditions. Document and coordinate the safety inspection activities and finding
with job site safety supervisor.
26) Competent in motivating manpower to achieve maximum work force efficiency.
27) Be able to work outdoors/indoors extreme cold or hot weather conditions
28) Inspect scaffolding materials after dismantling and signing tags.
29) Maintain the work area in a neat and orderly condition and cooperate with others
in housekeeping.
30) Prepare and maintain daily (activity) erection/dismantling measurement records
as per schedule job location, submit to client representative for approval, after
completion of each job activities. After approval from client, all the measurement
records submitted for invoice preparation.
31) Ability to calculate the volume of materials required to erect scaffold as per the job
requirement at site.
تفاصيل الوظيفة
منطقة الوظيفة الدمام, المملكة العربية السعودية
قطاع الشركة البناء والتشييد
طبيعة عمل الشركة صاحب عمل (القطاع الخاص)
الدور الوظيفي النفط والغاز
نوع التوظيف دوام كامل
الراتب الشهري $2,000 - $3,000
عدد الوظائف الشاغرة 10
المرشح المفضل
المستوى المهني متوسط الخبرة
عدد سنوات الخبرة الحد الأدنى: 5 الحد الأقصى: 10
الجنس ذكر
الشهادة دبلوم
العمر الحد الأدنى: 30 الحد الأقصى: 50
https://www.bayt.com/ar/saudi-arabia/jobs/scaffolding-supervisor-4130633/