الوصف الوظيفي
Ensures that he is aware of ADCO HSE rules and regulations, work
procedures, job locations, equipment to be worked on, tools and
equipment to be used and defining the anticipated start and finish time /
date and number of days.
o Shall submit permits / certificates (new request or for revalidation) for
Area Authority (AA) approval one day in advance and during daylight
hours .
Attend the PTW meeting with the JO ,AA & HSE on the day before start of
the activity to revalidate the TRA in case of high risk activity.
o Shall attach the TRA for HRA along with the submission of the permit /
certificates
o On the following day, and before the start time of the task, the Job
Performer shall print out the permit/ certificate and proceed to the work
location directly waiting arrival of Issuing Authority (IA) and Authorized
Gas Tester (AGT) if gas test is required.
The presence of JP or his crew at site does not mean to start the task,
before approving and issuing the permit / certificates officially to him by
IA. JP who starts the task before the permit / certificate are issued will be
considered a violator of PTW procedure and Life Protection Rules.
Equipment entry into the well site (apart from hazardous area) is covered
by the permit approved by AA and does not consider a violation to PTW
procedure although the permit is not yet approved by IA.
o JP is directly responsible for the safety and quality of work and must
ensure that the conditions specified on the PTW / Certificates are
adhered to and remained unchanged at all time.
o Ensures that no other task is performed or other tool is used except as
specifically described on the PTW / Certificate.
o Implements the Work Site Precautions as identified by the Area
Authority and checked by Issuing Authority on the PTW / Certificate
and TRA.
o Visibly displays the printed out copy of permit / certificate at the
worksite during the duration of the work.
o It is required to use PDA at remote areas to accept permit / certificates
o Conducts a Toolbox Talk (TBT) immediately before commencing the job
o Remains at the worksite during the duration of the work and obtains
Job Originator / Area Authority signature if Job Performer replacement
is required.
o Immediately suspends work in the event of the Emergency Siren or
General Alarm being activated.
o JP shall keep using the 1st day permit / certificates copy for the whole
duration period as stipulated in permit / certificates and to be signed
daily at location by him, Issuing Authority and Authorized Gas Tester (if
applicable).
o Shall daily re-validate permits / certificates through the ePTW system
without making new prints.
المهارات
o On completion or suspension of the job he must ensure that the work
site is left in a clean - clear and safe condition.
o Closes out the permit / certificate in the e-PTW system on the same
day of the completion of the work or on expiry of the permit /
certificates.
o On the last day of work, the hard copy shall be returned to the
concerned AA .
تفاصيل الوظيفة
منطقة الوظيفة أبوظبي, الإمارات العربية المتحدة
قطاع الشركة النفط والغاز
طبيعة عمل الشركة صاحب عمل (القطاع الخاص)
الدور الوظيفي السلامة والصحة المهنية
نوع التوظيف
الراتب الشهري غير محدد
عدد الوظائف الشاغرة غير محدد
المرشح المفضل
المستوى المهني متوسط الخبرة
*** تقدم على الرابط التالي : Apply on the following link ***
https://www.bayt.com/ar/uae/jobs/job-performer-4049492/
You can register your CV at bayt.com to apply for premium jobs.